City of Roseville

Roseville Parkway Extension

The Roseville Parkway Extension Project extended a major transportation corridor by constructing approximately 0.75 miles of new roadway and bridge infrastructure to improve connectivity, traffic flow, and multimodal access throughout the City of Roseville. The project included a new bridge, roadway construction, bicycle lanes, sidewalks, a multi-use trail, drainage improvements, and extensive coordination with Union Pacific Railroad (UPRR). Knight CM Group provided construction management, resident engineering, construction inspection, materials testing, and railroad coordination services to help ensure the successful delivery of this complex transportation improvement project.

Elements: Roadway construction, bridge construction, roadway extension, precast concrete girders, CIDH pile foundations, MSE retaining walls, roadway paving, curb and gutter, landscaped median, Class II bicycle lanes, sidewalks, multi-use trail, ADA curb ramps, drainage improvements, landscape irrigation, UPRR coordination, temporary works, traffic control, construction inspection, resident engineering, office engineering, materials testing, SWPPP oversight, labor compliance, public outreach, constructability reviews, scheduling, cost estimating.

Project Cost
$21 Million
Project Duration
September 2023 - December 2024