The Mare Island Causeway Bridge Rehabilitation Project restored and upgraded the historic movable bridge connecting Mare Island and the City of Vallejo, improving reliability, safety, and long-term functionality for both vehicular and marine traffic. The project included structural steel repairs, mechanical and electrical system upgrades, rehabilitation of bridge components, roadway improvements, and operational enhancements to extend the service life of this critical transportation link. Knight CM Group provided construction management, resident engineering, structures inspection, quality assurance, and contract administration services to support the successful delivery of this technically complex movable bridge rehabilitation project.
Elements: Movable bridge rehabilitation, structural steel repairs, bridge painting and coatings, mechanical system upgrades, electrical system upgrades, bridge machinery rehabilitation, roadway improvements, deck rehabilitation, traffic control, utility coordination, structural inspections, quality assurance, contract administration, resident engineering, construction inspection, operational system improvements, corrosion mitigation, safety enhancements, historic bridge preservation, construction management.