The Dowd Road over Raccoon Creek Bridge Replacement Project replaced an aging bridge with a new reinforced concrete structure designed to improve safety, reliability, and long-term performance for the traveling public. The project included bridge demolition, CIDH pile foundation construction, roadway approach reconstruction, utility relocations, drainage improvements, and environmental mitigation measures to minimize impacts to Raccoon Creek. As the prime consultant, Knight CM Group provided construction management, structures representation, construction inspection, and environmental compliance oversight to support the successful delivery of this critical infrastructure project.
Elements: Bridge replacement, bridge demolition, reinforced concrete bridge, CIDH pile foundations, roadway reconstruction, roadway approach improvements, asphalt paving, aggregate base, guardrail installation, drainage improvements, utility coordination, traffic control, stream diversions, rock slope protection, stormwater management (SWPPP), environmental compliance, biological monitoring, construction inspection, structures representation, construction management, stakeholder coordination, quality assurance.