The Arcade Creek and Cripple Creek Bridge Replacement Project improved safety and mobility along a key transportation corridor by replacing two aging bridges with modern structures designed to meet current roadway standards and enhance long-term reliability. The project included bridge demolition and replacement, roadway reconstruction, drainage improvements, utility coordination, and traffic management measures to maintain access throughout construction. Knight CM Group provided construction management, resident engineering, structures inspection, and quality assurance services, helping ensure successful project delivery while minimizing impacts to the traveling public.
Elements: Bridge replacement, bridge demolition, reinforced concrete bridges, roadway reconstruction, roadway approach improvements, grading and excavation, drainage improvements, utility coordination, traffic control, traffic staging, asphalt paving, aggregate base, erosion control, environmental compliance, construction inspection, resident engineering, quality assurance, contract administration, stakeholder coordination, public safety improvements.